Domestic wastewater treatment by real-scale electrocoagulation process


Koyuncu S., ARIMAN S.

Water Science and Technology, cilt.81, sa.4, ss.656-667, 2020 (SCI-Expanded, Scopus) identifier identifier

  • Yayın Türü: Makale / Tam Makale
  • Cilt numarası: 81 Sayı: 4
  • Basım Tarihi: 2020
  • Doi Numarası: 10.2166/wst.2020.128
  • Dergi Adı: Water Science and Technology
  • Derginin Tarandığı İndeksler: Science Citation Index Expanded (SCI-EXPANDED), Scopus, Academic Search Premier, PASCAL, Agricultural & Environmental Science Database, Analytical Abstracts, Aqualine, Aquatic Science & Fisheries Abstracts (ASFA), BIOSIS, Biotechnology Research Abstracts, CAB Abstracts, Chimica, Compendex, EMBASE, Environment Index, Geobase, MEDLINE, Pollution Abstracts, Public Affairs Index, Veterinary Science Database
  • Sayfa Sayıları: ss.656-667
  • Anahtar Kelimeler: Cost evaluation, Electrocoagulation, Wastewater treatment
  • Samsun Üniversitesi Adresli: Evet

Özet

In this study, domestic wastewaters originating from a settlement with a population of 17,500 were treated by electrocoagulation process in a real-scale EC plant and the economic applicability of the process was investigated. The removal efficiencies of control parameters in the influent and effluent of the real-scale treatment plant such as suspended solids (SS), biological oxygen demand (BOD), chemical oxygen demand (COD), total nitrogen (TN), total phosphorus (TP) and changes of pH and conductivity parameters were monitored for 12 months. The obtained data were evaluated according to European Urban Wastewater Treatment Directive, Turkish Water Pollution Control Regulation and Turkish Urban Wastewater Treatment Regulation. According to the results obtained, the removal efficiencies of the pollutant parameters were achieved in the range of 72-83% for SS, 67-80% for COD, 69-81% for BOD, 21-47% for TN and 27-46% for TP. Considering the Turkish wastewater discharge regulations, it can be concluded that the discharge standards for SS, COD and BOD parameters were achieved while they were not achieved in certain periods for TN and TP. In addition, the energy consumption and the operating cost of this real-scale plant were determined to be 0.49-0.54 kWh/m3 and 0.24-0.28 EUR/m3, respectively.